I have cut out some mounts for the lights from excess 12mm plywood and put them in a clamp to paint all the edges in one go. |
With a bit of effort I managed to bend the 6mm MDF and screwed a block of wood to the deck to maintain the shape while the glue dried. |
Test fitting the panels for the bottom level before painting them. |
All the panels are glued and joints sanded, I am now painting the 3mm MDF panels (on the table) for the roof of the top level, I will fir the lights before I fix down the ceiling. |
No comments:
Post a Comment